Office location&map
Headquarters
Keihan Dojima Building, 2-1-31 Dojima, Kita-ku, Osaka 530-0003 Japan
TEL +81-(0)6-6440-8117 FAX +81-(0)6-6440-8112
- 3 min on foot from Kitashinchi Station, JR-Tōzai Line
- 3 min on foot from Nishi-Umeda Station, Osaka Municipal Subway-Yotsubashi Line
- 6 min on foot from Umada Station, Hanshin Line
- 10 min on foot from JR Osaka Station
- 5 min on foot from Watanabebashi Station, Keihan-Nakanoshima Line
Direction to VINAS
- From JR OSAKA or Hanshin UMEDA station (about 10 min. walk):
- 1. Head South along Yotsubashi-Suji St.
- 2. Walk past the JR Tozai Line KITA SHINCHI station (which is the intersection of Yotsubashi -Suji St. and National Highway No. 1).
- 3. Follow the directions from JR Tozai Line KITA SHINCHI station.
- From JR Tozai Line KITA SHINCHI station:
- 1. Head South along Yotsubashi-Suji St.
- 2. Walk past Dojima Avanza on the left (East side of the street).
- 3. After passing the Kintetsu Dojima Building on the right (West side of the street), turn right into the first street.
- 4. You will see the entrance to the Keihan Dojima building on your left (South).
Tokyo Branch
4-7-35 Gotenyama Trust Tower 13F, Kita-Shinagawa, Shinagawa, Tokyo 140-0001 Japan
TEL +81-3-5791-2643 FAX +81-3-5791-2649
Shuttle Bus Information
- 10 min on foot from JR Shinagawa Station
- 5 min on foot from Kitashinagawa Station, Keihin Kyuko Line
- 3-5 min by the free shuttle bus
- - Boarding bus stop at Shinagawa Station: In front of wing TAKANAWA EAST near Takanawa Exit
- - Bus stop at Gotenyama Garden: Parking lobby located on the 1st floor of Gotenyama Garden.
- *Please be forewarned that drop-off bus stop at Shinagawa Station differ from boarding bus stop.
- *Please refer URL below for time table